How to Build a Garage in Michigan, Step by Step

From the first sketch to the final inspection: what building a new detached or attached garage involves in Michigan, and the decisions that matter most.

  • Zoning and permits
  • Footings below the frost line
  • Stick-built or post frame
  • Inspections, in order

Before you start

A new garage is one of the most useful things you can add to a Michigan property: a dry place for vehicles through the winter, storage, and often a workshop. It's also a real building, with a foundation, a structure designed for snow, and inspections along the way.

This guide walks through the whole process in the order it happens. Rules differ between cities and townships, so treat it as a map, and let your local building and zoning departments have the final word on the details.

The steps to building a garage

  1. Decide what the garage is for

    Count the vehicles, then add room for what else will live there: mowers, bikes, a workbench, storage. Two-car garages are commonly about 24 by 24 feet. A truck, trailer or boat may need a taller door and higher walls. Decide now whether you want power, lighting, heat, water or a loft, because each one changes the plans.

    Illustration: a homeowner sketching a garage plan, thinking of a truck, a mower and a workbench
  2. Check zoning and setbacks

    Your city or township's zoning ordinance decides where a garage can go and how big it can be: distance from property lines, maximum size and height, and how much of the lot can be covered. Some areas also limit accessory buildings in front of the house. If you have a homeowners' association, check its rules too.

    Illustration: measuring the setback from a property-line stake to the garage corner
  3. Choose stick-built or post frame

    A stick-built garage has framed walls on a concrete foundation and suits attached garages and buildings that should match the house. A post frame (pole barn) garage stands on posts, with fewer continuous footings, and works well for larger detached buildings, workshops and storage. More on the choice below.

    Illustration: a stick-built garage frame on a slab beside a post frame building on posts
  4. Get plans and a building permit

    Almost every new garage needs a building permit in Michigan. Expect to provide a site plan showing the garage and its distances to the property lines, construction drawings, and the truss specifications. Electrical work usually needs its own permit. Only start once the permit is issued and posted.

    Illustration: handing garage plans to the building department for a permit
  5. Call MISS DIG 811 and prepare the site

    Michigan law requires a call to MISS DIG 811 at least three working days before you dig, so buried gas, electric and communication lines get marked. Then stake out the building, strip the topsoil, and grade so water drains away from where the garage will sit.

    Illustration: utility marking flags and paint lines while a skid steer strips the garage site
  6. Build the foundation below the frost line

    Michigan ground freezes deep in winter, and frozen soil lifts anything that sits above it. Footings go below the frost line, typically 42 inches in Southern Michigan, though your building department sets the exact depth. Some communities allow a thickened-edge slab for a detached garage instead. Expect a footing inspection before any concrete is poured.

    Illustration: cross-section of a footing set below the frost line, with an inspector at the trench
  7. Pour the garage slab

    The floor is a concrete slab on a compacted gravel base, sloped slightly toward the door so water and melting snow run out. Concrete gains strength over weeks, so the slab should cure before heavy loads go on it. See our concrete work for slabs, aprons and driveways.

    Illustration: workers pouring and screeding a concrete garage slab inside wooden forms
  8. Frame the walls and set the trusses

    Walls are framed and anchored to the foundation, then the roof trusses are set. Trusses are designed for the snow load in your area, which is one reason the permit asks for their specifications. A framing inspection usually follows.

    Illustration: a crew setting roof trusses on sheathed garage walls
  9. Close it in: roof, doors and windows

    Sheathing, underlayment and shingles or metal go on the roof, then the overhead door, the entry door and any windows. Once it's closed in, the weather can't slow the rest of the job.

    Illustration: roofers shingling while workers install the overhead and entry doors
  10. Finish the outside

    Siding, trim, soffit, fascia and gutters. Matching the house's siding and roof makes an attached or nearby garage look like it was always there.

    Illustration: installing siding and gutters on a new garage that matches the house
  11. Wire it and pass the final inspection

    Electrical work is inspected before the walls are covered, if they will be. The final inspection checks the finished building against the approved plans. Keep the approval: it matters for insurance and when you sell.

    Illustration: an electrician wiring an outlet as the inspector gives a thumbs-up
  12. Add the apron and driveway

    A concrete apron and driveway connect the garage to the road and keep mud out of the building. They can be poured with the slab or after the build is finished.

    Illustration: the finished garage with a new concrete apron and driveway

Stick-built or post frame?

Both make a solid garage. The right one depends on the building and how you'll use it.

Stick-built garage

Framed walls on a full concrete foundation.

  • Best for attached garages
  • Matches the house's look
  • Easy to insulate and finish inside

Post frame garage

Posts carry the building, with fewer continuous footings.

  • Efficient for larger buildings
  • Wide, open spans inside
  • Popular for workshops and storage

Not sure which fits? We build both. See garages & post frame buildings.

What the building department will usually ask for

  • A site plan with distances to the property lines
  • Construction drawings
  • Truss specifications
  • Foundation details and footing depth
  • A separate electrical permit
  • Inspections: footing, framing, electrical and final

Requirements differ by city and township. Call yours before you finalize plans.

Design your garage online

Try sizes, doors and colors in our online Building Designer, then send it to us for an estimate.

Open the Building Designer

Garages we've built

See all projects

Garage building questions

Do I need a permit to build a garage in Michigan?

Almost always. A new garage needs a building permit from your city or township, and electrical work usually needs its own. Only very small accessory buildings are exempt. Your local building department can tell you exactly what they require.

How deep do garage footings need to be in Michigan?

Below the frost line, which is typically 42 inches in Southern Michigan. Your building department sets the required depth, and some communities allow a thickened-edge slab for detached garages.

Who do I call before digging for a garage?

MISS DIG 811. Michigan law requires the call at least three working days before you dig, so buried utility lines can be marked for free.

Is a pole barn garage cheaper than a stick-built garage?

Often, especially for larger detached buildings, because post frame construction needs fewer continuous footings. For an attached garage, or one that should match the house, stick-built is usually the better fit. Ask us for an estimate on both.

Can Livingston Building Solutions build my garage?

Yes. We build detached garages, attached garages and post frame buildings across Lenawee, Washtenaw and Livingston counties, from permits and site prep through the final inspection. Request an estimate.